摘要
A novel and cleaner process for lead and silver recycling from multiple lead-containing wastes, e.g., lead ash, lead sludge, lead slag, and ferric sludge, by reductive sulfur-fixing smelting was proposed. In this process, coke and iron-containing wastes were employed as reductive agent and sulfur-fixing agent, respectively. A Na2CO3-Na2SO4mixture was added as flux. The feasibility of this process was detected from thermodynamic and experimental perspectives. The influence of Fe/SiO2and CaO/SiO2, composition of the molten salt, coke addition, smelting temperature, and smelting time on direct Pb recovery and sulfur-fixation efficiency were investigated. The optimal process conditions were determined as follows:WCoke= 15%WPb wastes,WNa2CO3/WNa2SO4= 0.7/0.3, Fe/SiO2= 1.10, CaO/SiO2= 0.30, smelting temperature 1200 °C, and smelting time 2 h, whereWrepresents weight. Under these optimum conditions, 92.4% Pb and 98.8% Ag were directly recovered in crude lead bullion in one step treatment, and total 98.6% sulfur was fixed. The generation and emissions of SO2can be avoided. The main phases in ferrous matte obtained were FeS, NaFeS2, Fe2Zn3S5, and a little entrained Pb. The slag was a FeO-SiO2-CaO-Na2O quaternary melt.Keywords:SO2-free sulfur fixing smelting;lead recycling;wastes co-treatment and recycling;lead-iron-containing wastes;molten salt;PbO-FeO-SiO2-CaO-Na2O phase diagram
危险品化学品经营许可证(带存储)